Skip to main content

Delta Resources announces positive initial phase 2 drill results from Delta-1

Delta Resources CEO Andre Tessier joined Steve Darling from Proactive to share significant news regarding the company's second phase of drilling at the Delta-1 Gold project near Thunder Bay, Ontario.

Initial assay results from 23 drill holes have been received out of a total of 44 holes drilled so far. The results indicate the definition of high-grade gold shoots from surface within the Alpha and Beta mineralized zones.

One notable drill hole, D1-23-60, showed gold grades of 1.79 g/t over 128.5 meters from a depth of 25.5 meters. This included a higher-grade section of 2.16 g/t gold over 97.5 meters, also from 25.5 meters to 123 meters.

Furthermore, the widely spaced drill holes successfully intersected the gold-bearing alteration corridor hosting the Eureka Gold Mineralization at shallow depths. The corridor has been extended an additional 500 meters to the east, with lower-grade intercepts over 16.4 meters.

Future drilling campaigns are planned to further test and delineate the high-grade gold shoots within this structure, as defined within the Eureka Zone.

These assay results are highly encouraging and indicate the potential for significant gold mineralization at the Delta-1 Gold project.

Delta Resources is dedicated to continuing its exploration efforts and unlocking the project's full potential.

Contact Details

Proactive Investors

+1 604-688-8158

na-editorial@proactiveinvestors.com

Recent Quotes

View More
Symbol Price Change (%)
AMZN  198.79
-0.81 (-0.41%)
AAPL  255.78
-5.95 (-2.27%)
AMD  207.32
+1.38 (0.67%)
BAC  52.55
+0.03 (0.06%)
GOOG  306.02
-3.35 (-1.08%)
META  639.77
-10.04 (-1.55%)
MSFT  401.32
-0.52 (-0.13%)
NVDA  182.81
-4.13 (-2.21%)
ORCL  160.14
+3.66 (2.34%)
TSLA  417.44
+0.37 (0.09%)
Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the Privacy Policy and Terms Of Service.