SECURITIES AND EXCHANGE COMMISSION
FORM 6-K
Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16 of
the Securities Exchange Act of 1934
For the month of November, 2007
Commission File Number 001-32748
CORRIENTE RESOURCES INC. |
(Translation of registrant's name into English) |
520 - 800 West Pender Street, Vancouver, British Columbia, CANADA V6C 2V6 |
(Address of principal executive offices) |
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F _____ Form 40-F X
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ____
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ____
Indicate by check mark whether by furnishing the information contained in this Form, the registrant is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.
Yes _____ No X
If "Yes" is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): 82-_______________
DOCUMENTS INCLUDED AS PART OF THIS REPORT
Document | |
1. |
Disclosure statements as required by National Instrument 43-101 are available at our website www.corriente.com |
||
"NEWS RELEASE"
For Immediate Release | November 19, 2007 |
TSX: CTQ, AMEX: ETQ |
PRELIMINARY ASSESSMENT FOR PANANTZA-SAN CARLOS COPPER PROJECT
DEMONSTRATES POSITIVE ECONOMICS AND MAJOR COPPER INVESTMENT
POTENTIAL IN ECUADOR
Project to produce over 400 Million pounds of copper annually
VANCOUVER, CANADA, November 19, 2007 Corriente announces that a positive preliminary assessment ("PA") has been completed for the companys 100% owned PanantzaSan Carlos Copper Project ("the Project"), situated approximately 40 kms north of Corrientes 100% owned Mirador copper project in southeastern Ecuador. The PA projects over 400 Million pounds of annual copper production for the Project and shows a projected capital cost of approximately US$ 1.3 Billion, which would be spent over a two year construction period prior to the start of production. The company plans to move the Project to the Feasibility Study stage with a planned budget of approximately US$ 12 Million in field and engineering work over the next two years.
Mr. Ken Shannon, CEO of Corriente stated, "The Company is pleased with the positive economics of this new copper Project and with the favourable culmination of our efforts to respond to the demands of several segments of Ecuadorian society looking to attract responsible investment to the country. The development of major mineral resources will be for the benefit of the communities of the Morona-Santiago and Zamora-Chinchipe provinces as well as the entire country. Corriente will work with the communities and the Government to ensure social, environmental and economic sustainability. Under these key conditions implemented by the current administration of President Raphael Correa, we feel Ecuador is ready to start its mining future."
Highlights
520 800 West Pender Street, Vancouver, B.C. V6C 2V6
T (604) 687-0449 F (604) 687-0827 Email copper@corriente.com
Resource
Total estimated inferred resources at Panantza and San Carlos are as follows:
|
Tonnage (tonnes) |
Copper |
Panantza (0.4% Cu cut-off) |
463,000 |
0.66% |
San Carlos (0.4% Cu cut-off) |
600,000 |
0.59% |
Total |
1,063,000 |
0.62% |
The mine plan for the PA utilized 678 Million tonnes or approximately 64% of the overall inferred resource contained within the two deposits. Mineralization at both deposits is open for extension.
Mining
Ore and waste quantities were generated from 3-D models of both deposits. The potential resource at San Carlos was restricted by tailings capacity. With an expanded tailings design, the portion of San Carlos resources that could be available for mining would significantly increase. Mining of 189,000 tonnes per day of ore and waste would commence with the Panantza deposit and move to San Carlos at year 10. The current mine plan calls for co-disposal of waste rock in either the tailings storage facility or the mined out Panantza pit, depending on the phase of mining. The strip ratio for Life of Mine is 1.1(waste):1(ore).
Processing
The process plant is a conventional concentrator that would process 90,000 tonnes per day of copper ore containing 0.62% Cu, 0.008% Mo, 1.3 g/t Ag and 0.05 g/t Au over the life of the mine. The copper concentrate produced is expected to average 29.5% Cu and a separate molybdenum concentrate is expected to average 49% Mo. The concentrate would be transported via a 473 km pipeline to a port on the coast for shipping to smelters.
Infrastructure
The existing Amazon highway system comes within six kilometres of the Project site and local gravel roads would have to be upgraded to improve mine access. The conceptual design of the PA calls for a 111 km, 230 kV transmission line to be constructed to connect directly to the main electrical grid at Sinincay.
Socio-Economic
The principal needs of the local population are employment and infrastructure development. Extensive migration of residents within Ecuador and abroad has occurred because of the poor local job market. The company has started a program of dialogue with the local communities and government to ensure any development at Panantza and San Carlos is sensitive to their needs and fits with the requirement that projects are environmentally responsible.
Construction
The estimated cost to build the 90,000 tonne per day plant and associated infrastructure is US$ 1.3 Billion, with an accuracy estimated to range from -5% to +35%. Labour is estimated at 4,500,000 manhours of direct construction work and mine pre-development. The execution period for the Project would be 41 months total, with a construction period of approximately 24 months.
520 800 West Pender Street, Vancouver, B.C. V6C 2V6
T (604) 687-0449 F (604) 687-0827 Email copper@corriente.com
Copper Price Sensitivity
The Project was based on a copper price assumption of US$ 1.50/lb; holding all other prices constant and varying copper prices provides the following table, which highlights the strong economics of the Project at current copper prices which exceed US$ 3.00/lb.
Copper Price |
NPV |
IRR |
US$/lb |
US$ million |
|
$1.25 |
$133 |
9.5% |
$1.50 |
$676 |
15.1% |
$1.75 |
$1,183 |
19.7% |
$2.00 |
$1,718 |
24.1% |
$2.25 |
$2,289 |
28.6% |
$2.50 |
$2,847 |
32.8% |
$2.75 |
$3,408 |
36.8% |
$3.00 |
$3,670 |
40.7% |
In general, the PA indicates that the Project is more sensitive to copper price and copper recovery than to capital and operating cost fluctuations.
The PA study was completed by a team of in-house staff and external engineering consultants, including Merit Consultants International Inc., Hoffert Processing Solutions Inc. and Knight Piésold Ltd. The full NI 43-101 Technical Report will be available on SEDAR within 45 days of this announcement.
Recommendations
The Project is recommended to proceed to the Feasibility Study stage, which has an estimated budget requirement of approximately US$ 12 Million. The work would include detailed diamond drilling at both deposits to fully delineate mineralization and provide core for metallurgical and geotechnical studies. This work is planned to extend over a two year period. In addition, a program of extensive community dialogue is planned to ensure that the voice of local residents is reflected in any planned development ideas. Part of this dialogue will include several public consultations, which will form part of the on-going permitting process. Fieldwork is not expected to start until the completion of negotiations with the Ecuador government regarding the lifting of a suspension order that applies to the companys Mirador, Panantza and San Carlos concessions.
Given the world-class size of the proposed Panantza-San Carlos development, Corriente intends to seek an investment partner who would work to advance PanantzaSan Carlos as part of a cluster of projects in southeast Ecuador that are envisioned to form a Mining Center of Excellence. In parallel with the advancement of a jointly developed Panantza-San Carlos Project, Corriente will move forward its 100% owned Mirador project as planned. The principles for development of these projects will be investment in the earth, following the practices of modern responsible mining. Responsible mining will provide a balance between protection for the environment, which is crucial to the people of Ecuador, and jobs and infrastructure development, which are also critically important for this region.
520 800 West Pender Street, Vancouver, B.C. V6C 2V6
T (604) 687-0449 F (604) 687-0827 Email copper@corriente.com
ABOUT CORRIENTE Corriente is moving towards construction of a starter
operation at its Mirador copper-gold operation. Mirador is one of the few new,
sizeable copper projects available for near-term production. Corriente controls
a 100% interest in over 50,000 hectares located within the Corriente Copper
Belt, Ecuador. The Belt currently contains four copper and copper-gold porphyry
deposits: Mirador, Mirador Norte, Panantza and San Carlos. Additional
exploration activities are ongoing, as six additional copper and copper-gold
exploration targets have been identified in the Corriente Copper Belt to date.
"Ken Shannon" Kenneth R. Shannon For further information, please contact Mr. Dan Carriere,
Senior Vice-President, Certain statements contained in this News Release constitute
forward-looking statements. Such forward-looking statements involve a number of
known and unknown risks, uncertainties and other factors which may cause the
actual results, performance or achievements of the companys plans to materially
differ from any future results, performance or achievements expressed or implied
by such forward-looking statements. Readers are cautioned not to place undue
reliance on these forward-looking statements, which speak only as of the date
the statements were made, and readers are advised to consider such
forward-looking statements in light of the risks set forth in the companys
continuous disclosure filings as found at www.sedar.com .
CEO
at (604) 687-0449 or see our web site at www.corriente.com.
520 800 West Pender Street, Vancouver, B.C. V6C 2V6
T (604) 687-0449 F (604) 687-0827 Email copper@corriente.com
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
CORRIENTE RESOURCES INC. | ||
(Registrant) | ||
Date: November 19, 2007 | ||
By: |
/S/ DARRYL F. JONES | |
Name: Darryl F. Jones | ||
Title: Chief Financial Officer |