Document
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, DC 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16 OF
THE SECURITIES EXCHANGE ACT OF 1934

Report on Form 6-K dated August 20, 2018

Commission File Number 1-14846

            AngloGold Ashanti Limited           
(Name of registrant)

76 Rahima Moosa Street
Newtown, 2001
(P.O. Box 62117, Marshalltown, 2107)
        South Africa        
(Address of principal executive offices)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.

Form 20-F X Form 40-F

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1):
Yes No X

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7):
Yes No X

Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.
    
Yes No X

Enclosure: Press release ANGLOGOLD ASHANTI REPORT FOR THE SIX MONTHS ENDED 30 JUNE 2018





mastersecjune2017image1a01.jpg
AngloGold Ashanti Limited
(Incorporated in the Republic of South Africa)
Reg. No. 1944/017354/06
ISIN. ZAE000043485 – JSE share code: ANG
CUSIP: 035128206 – NYSE share code: AU
JSE Bond Company Code - BIANG
(“AngloGold Ashanti” or the “Company”)

Report
for the six months ended 30 June 2018

Johannesburg, 20 August 2018 - AngloGold Ashanti is pleased to provide its financial and operational update for the six-month period ended 30 June 2018.
Strong first half of 2018; production from retained operations up 4% year-on-year
All-in sustaining costs decreased 5% to $1,020/oz versus first half of 2017
Adjusted EBITDA up 19% to $723m versus first half of 2017
Free cash flow for H1 2018 improved by $110m year-on-year, from -$161m to -$51m
Q2 2018 Free cash flow generation of $19m, from an outflow of $41m in Q2 2017
Guidance remains on track on all metrics
Full-year production expected at the top end, and costs trending towards lower end, of guidance
Net debt down 17% year-on-year, to $1.786bn; Net debt to Adjusted EBITDA ratio of 1.12 times
South African footprint reduced after completion of Vaal River asset sales
Obuasi agreements successfully delivered and ratified, paving way for project development
Key brownfields projects remain on track and on budget
All-injury frequency rate down 31% from H1 2017; the lowest level in the Company’s history
 
 
 
Six months
Six months
Year
 
 
 
 
ended
ended
ended
 
 
 
 
Jun
Jun
Dec
 
 
 
 
2018
2017
2017
 
 
 
 
 
Restated
Restated
 
 
 
 
US Dollar / Imperial
 
Operating review
 
 
 
 
 
 
Gold
 
 
 
 
 
 
Produced
- oz (000)
 
1,629
1,748
3,755
 
Sold
- oz (000)
 
1,651
1,790
3,772
 
 
 
 
 
 
 
 
Produced from retained operations
- oz (000)
 
1,578
1,517
3,279
 
 
 
 
 
 
 
 
Financial review
 
 
 
 
 
 
Gold income
- $m
 
1,922
2,032
4,356
 
Cost of sales
- $m
 
1,602
1,790
3,736
 
Total cash costs
- $m
 
1,281
1,339
2,863
 
Gross profit
- $m
 
410
325
784
 
 
 
 
 
 
 
 
Price received *
- $/oz
 
1,310
1,231
1,251
 
All-in sustaining costs *
- $/oz
 
1,020
1,071
1,054
 
All-in costs *
- $/oz
 
1,110
1,144
1,126
 
Total cash costs *
- $/oz
 
823
796
792
 
 
 
 
 
 
 
 
Profit (loss) attributable to equity shareholders
- $m
 
33
(176)
(191)
 
 
- cents/share
 
8
(43)
(46)
 
Headline earnings (loss)
- $m
 
99
(89)
27
 
 
- cents/share
 
24
(22)
6
 
Adjusted headline earnings (loss) *
- $m
 
85
(93)
9
 
 
- cents/share
 
21
(23)
2
 
Net cash flow from operating activities
- $m
 
321
321
997
 
Free cash inflow (outflow) *
- $m
 
(51)
(161)
1
 
Total borrowings
- $m
 
2,051
2,366
2,268
 
Net debt *
- $m
 
1,786
2,151
2,001
 
Capital expenditure
- $m
 
335
454
953
 
 
 
 
 
 
 
 
Notes:  * Refer to "Non-GAAP disclosure" for definition.
 
$ represents US Dollar, unless otherwise stated.
 
 
For restatements refer note 16.
 
 
Rounding of figures may result in computational discrepancies.

Published : 20 August 2018
June 2018



Operations at a glance
 
 
 
 
 
 
 
 
 
for the six months ended 30 June 2018
 
 
 
 
 
 
 
 
 
Production
Cost of sales
All-in sustaining costs1
Total cash costs 2
Gross profit (loss)
 
oz (000)
Year-on-year
% Variance 3
$m
Year-on-year
% Variance 3
$/oz
Year-on-year
% Variance 3
$/oz
Year-on-year
% Variance 3
$m
Year-on-year
$m Variance 3
SOUTH AFRICA
257

(41)

(352)

(38)

1,306

4

1,152

6

(10)

18

Vaal River Operations
51

(71)

(76)

(65)

1,445

24

1,307

30

1

(6)

Kopanang
12

(72)

(28)

(64)

2,076

23

2,007

36

(9)

11

Moab Khotsong
39

(70)

(48)

(66)

1,250

25

1,086

28

10

(17)

West Wits Operations
119

(27)

(171)

(31)

1,359

(8)

1,153

(8)

(13)

30

Mponeng
119

12

(171)

24

1,359

6

1,147

10

(13)

(8)

TauTona

(100)


(100)


(100)


(100)


38

Total Surface Operations
87

(6)

(104)

6

1,146

14

1,061

9

3

(6)

 
 
 
 
 
 
 
 
 
 
 
INTERNATIONAL OPERATIONS
1,372

4

(1,509)

4

948

(4)

769

10

442

104

 
 
 
 
 
 
 
 
 
 
 
CONTINENTAL AFRICA
695

5

(788)

6

939

(3)

816

13

185

42

DRC
 
 
 
 
 
 
 
 
 
 
Kibali - Attr. 45% 4
168

32

(195)

7

876

(26)

699

(20)

32

50

Ghana
 
 
 
 
 
 
 
 
 
 
Iduapriem
126

18

(117)

21

928

(10)

781

(8)

57

21

Obuasi

(100)

4

276





4


Guinea
 
 
 
 
 
 
 
 
 
 
Siguiri - Attr. 85%
127

(19)

(139)

(23)

826

4

798

12

50

(10)

Mali
 
 
 
 
 
 
 
 
 
 
Morila - Attr. 40% 4
15

22

(19)

30

1,319

10

1,075

8

1


Sadiola - Attr. 41% 4
30

(1)

(36)

13

1,050

11

980

14

4

(2)

Tanzania
 
 
 
 
 
 
 
 
 
 
Geita
229


(284)

20

1,030

10

891

60

30

(16)

Non-controlling interests, exploration and other




(21)

(23)

 
 
 
 
9

(1)

 
 
 
 
 
 
 
 
 
 
 
AUSTRALASIA
306

20

(290)

16

1,052

(3)

790

2

100

35

Australia
 
 
 
 
 
 
 
 
 
 
Sunrise Dam
153

43

(149)

25

1,124

(3)

888

(9)

46

32

Tropicana - Attr. 70%
153

3

(132)

10

938

(1)

655

14

64

1

Exploration and other
 
 
(10)

(16)

 
 
 
 
(10)

2

 
 
 
 
 
 
 
 
 
 
 
AMERICAS
371

(6)

(430)

(7)

877

(9)

662

7

157

27

Argentina
 
 
 
 
 
 
 
 
 
 
Cerro Vanguardia - Attr. 92.50%
141

1

(179)

(8)

657

(17)

489


85

21

Brazil
 
 
 
 
 
 
 
 
 
 
AngloGold Ashanti Mineração
175

(11)

(188)

(5)

999


761

19

53

(8)

Serra Grande
55

(4)

(64)

(12)

1,075

(18)

802

(8)

10

10

Non-controlling interests, exploration and other
 
 
1

41

 
 
 
 
8

4

 
 
 
 
 
 
 
 
 
 
 
Total
1,629

(7)

 
 
1,020

(5)

823

3

 
 
 
 
 
 
 
 
 
 
 
 
 
OTHER
 
 
8

432

 
 
 
 
15

12

 
 
 
 
 
 
 
 
 
 
 
 
 
 
(1,852)

(8)

 
 
 
 
447

134

 
 
 
 
 
 
 
 
 
 
 
Equity accounted investments included above
 
250

10

 
 
 
 
(37)

(49)

 
 
 
 
 
 
 
 
 
 
 
AngloGold Ashanti
 
 
(1,602)

(10)

 
 
 
 
410

85

 
 
 
 
 
 
 
 
 
 
 
1 Refer to note C under "Non-GAAP disclosure" for definition.
 
 
 
 
 
 
 
2 Refer to note D under "Non-GAAP disclosure" for definition.
 
 
 
 
 
 
 
3 Variance June 2018 six months on June 2017 six months - increase (decrease).
 
 
 
 
 
 
4 Equity accounted joint ventures.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 




Financial and Operating Report

FINANCIAL AND CORPORATE REVIEW (1) 
AngloGold Ashanti continued to deliver on its strategy to improve free cash flow and returns, with a strong first-half operating and financial result. Production from retained operations increased by 4% year-on-year, which along with good cost control and a higher gold price, helped drive improvements in earnings and free cash flow. Productivity rates, up 58% from 2012, continued to improve as the effects of portfolio restructuring became evident, brownfields investments started to yield returns, and operational efficiency initiatives gained traction. Strong progress on many fronts allowed AngloGold Ashanti to maintain guidance across all metrics with production expected at the top end of the range and costs trending towards the lower end of the range.
The sale of the Vaal River underground mines was completed at the end of February, and the proceeds were immediately applied to reduce debt and further improve balance sheet flexibility. Brownfields projects remained on track and on budget. The ratification of investment agreements by Ghana’s Parliament in June 2018 allowed the redevelopment of the high-grade Obuasi Gold Mine to commence in earnest.
“We continued to improve our portfolio, strengthen our balance sheet and increase productivity, all of which are the cornerstones of our strategy to improve free cash flow and returns over the long term,” Chief Executive Officer Srinivasan Venkatakrishnan said. “The business is in good shape - production is strong, costs are improving and our pipeline is well stocked with options.”
Group Operating Performance
Production from retained operations for the first six months of 2018 (excluding Moab Khotsong, Kopanang and TauTona mines) was 1.578Moz at a total cash cost of $807/oz, compared to 1.517Moz at a total cash cost of $740/oz for the first six months of 2017. All-in sustaining costs (AISC) for these retained operations were $1,005/oz for the first six months of 2018, compared to $1,030/oz in the same period last year.

The International Operations achieved a 4% year-on-year reduction on AISC to $948/oz during the first half of 2018 from $988/oz during the first half of 2017, alongside a 4% increase in production to 1.372Moz from 1.313Moz.
 
Total production for the group, including those operations either sold or closed earlier this year, was 1.629Moz at a total cash cost of $823/oz for the six months ended 30 June 2018, compared to 1.748Moz at a total cash cost of $796/oz in the first six months of 2017. AISC for this set of assets fell 5% to $1,020/oz, versus $1,071/oz in the first half of 2017.

There was a $16/oz improvement in group total cash costs from the first to the second quarter of this year, reflecting a positive trend in performance as the Operational Excellence initiative starts to gain traction. This trend is expected to continue over the remainder of the year and beyond, as underground production at Kibali continues to ramp up, Sunrise Dam’s improving productivity trend continues, Brazil recovers from minor disruptions related to a nationwide trucker strike during the first half of this year, and South Africa completes its restructuring and ramp-up at Mponeng’s below 120 area.
Group Cash Flow and Earnings
Free cash flow for the six months ended 30 June 2018 improved by $110m to an outflow of $51m from an outflow of $161m in the first six months of last year. Free cash flow of $19m was recorded during the second quarter of the year. The year-on-year movement in free cash flow was aided by a higher gold price received, lower capital expenditure and an improved operating performance, and was partially offset by a reduction in gold sold and the lock-up of $29m indirect taxes in Tanzania ($19m) and the Democratic Republic of Congo ($10m). The Company generated $13m of free cash flow before investment of growth capital during the first six months of the year.

The Company reported basic earnings attributable to shareholders of $33m, or 8 US cents per share for the first six months of 2018. This includes the adverse impact of $66m, or 16 US cents per share (post-tax) related to the impairment of the Mine Waste Solutions Uranium plant in South Africa, given that, under current market conditions, the plant is unlikely to be utilised. This compared to a loss of $176m, or 43 US cents per share in the first half of last year, which included impairments on certain South African assets of $86m, or 21 US cents per share (post tax).
Adjusted headline earnings were $85m, or 21 US cents per share, for the first six months of 2018 versus a loss of $93m, or 23 US cents per share in the first half of 2017. Increases in adjusted headline earnings were due mainly to the improved operating performance and the higher gold price received.
Adjusted earnings before interest, tax, depreciation and amortisation (Adjusted EBITDA) grew 19% to $723m, during the first half of 2018, compared to $610m in the first half of last year, which included the $63m pre-tax impact from the silicosis class-action law suit settlement provision made last year.
Net debt declined by 17% to $1.786bn at 30 June 2018, from $2.151bn at the same time last year. The balance sheet remains robust, with the $1bn US Dollar RCF undrawn, A$325m undrawn on the A$500m Australian dollar RCF, approximately R4.5bn available from the South African RCF's and other facilities, and cash and cash equivalents of $215m, at 30 June 2018.
 
The ratio of Net debt to Adjusted EBITDA at the end of June was 1.12 times, compared to 1.56 times at 30 June 2017. The current Net debt to Adjusted EBITDA ratio falls well below the covenant ratio of 3.5 times which applies under the revolving credit facilities, and also below AngloGold Ashanti’s own target of 1.5 times, through the cycle

(1) Production and financial results from retained operations for the six months ended 30 June 2018 have been presented as part of this financial and corporate review. Retained operations exclude any results from Moab Khotsong, Kopanang and TauTona and these results have been provided for illustrative purposes only. This information constitutes pro forma information.




Capital expenditure (including equity accounted investments) decreased by 26% from $454m for the six months ended 30 June 2017 to $335m for the six months ended 30 June 2018. This decrease was largely due to a decrease in capital expenditure in South Africa, the Americas and in Continental Africa. It is expected that group capital expenditure will increase in the second half of the year relative to the first half, in line with past trends, whilst remaining within the guided range.

Summary of six months-on-six months operating and cost variations:
Particulars
Six months ended
June 2018
Six months ended
June 2017
% Variation
six months vs prior year six months
Six months ended June 2018 Excluding Closed and sold operations
Six months ended June 2017 Excluding Closed and sold operations
% Variation six months vs prior year six months
Operating review
Gold
Production (kozs)
1,629
1,748
(7)

1,578
1,517
4
 
Financial review
Gold price received ($/oz)
1,310
1,231
6

1,310
1,231
6
Total cash costs ($/oz)
823
796
3

807
740
9
Corporate & marketing costs ($m) *
37
35
6

37
35
6
Exploration & evaluation costs ($m)
46
62
(26)

46
62
(26)
All-in sustaining costs ($/oz) **
1,020
1,071
(5)

1,005
1,030
(2)
All-in costs ($/oz) **
1,110
1,144
(3)

1,099
1,114
(1)
Adjusted EBITDA ($m)
723
610
19

722
594
22
 
Cash inflow from operating activities ($m)
321
321

320
312
3
Free cash outflow ($m)
(51)
(161)
68

(44)
(130)
66
Free cash outflow excluding SAR redundancies ($m)
(12)
(152)
92

(5)
(121)
96
 
Capital expenditure ($m)
335
454
(26)

328
414
(21)

* Includes administration and other expenses.
** World Gold Council standard, excludes stockpiles written off.
2018 Guidance Update
 
 
Guidance
Notes
Production (000oz)
3,325 - 3,450
Includes two months production from Moab Khotsong and Kopanang at ~30koz per month
Costs
All-in sustaining costs ($/oz)
990 - 1,060
See economic assumptions below
Total cash costs ($/oz)
770 - 830
Overheads
Corporate costs ($m)
70 - 80
 
Expensed exploration and study costs ($m)
115 - 125
Including equity accounted joint ventures
Capex
Total ($m)
800 - 920
 
Sustaining capex ($m)
600 - 670
 
Non-sustaining capex ($m)
200 - 250
Expenditure related to Obuasi, Siguiri Hard Rock project, Kibali and Mponeng
Depreciation and amortisation ($m)
775
 
Depreciation and amortisation - included in equity accounted earnings ($m)
150
Earnings of associates and joint ventures
Interest and finance costs ($m) - income statement
140
 
Other operating expenses ($m)
90
Primarily related to the costs of care and maintenance
The 2018 guidance is maintained at the previous levels reported, with production expected at the top end of the range and costs trending towards the lower end of the range. Economic assumptions have been adjusted as follows: ZAR12.90/$, $/A$0.76, BRL3.56/$, AP25.06/$; Brent $74/bl.

Both production and cost estimates assume neither operational or labour interruptions, or power disruptions, nor further changes to asset portfolio and/or operating mines and have not been reviewed by our external auditors. Other unknown or unpredictable factors could also have material adverse effects on our future results and no assurance can be given that any expectations expressed by AngloGold Ashanti will prove to have been correct. Please refer to the Risk Factors section in AngloGold Ashanti’s annual report on Form 20-F for the year ended 31 December 2017, filed with the United States Securities and Exchange Commission (SEC).







OPERATING HIGHLIGHTS

International operations have delivered a reduction in AISC, reflecting the results of the intensified work on the Operational Excellence initiative. The Company continued to deliver on its strategic objective to improve the quality of its portfolio, as the higher spending on capital in the last year has begun to bear fruit. There have been delays in permitting in Brazil, which although now resolved, are expected to have only a minor impact on the region’s production for the year.

The Continental Africa region posted a strong operating performance, led by higher grades and volumes at Iduapriem, and also at Kibali where underground production continued to ramp up. Inflationary pressure, dominated by higher fuel prices, led to higher total cash costs year-on-year of $816/oz, up from $721/oz in the first half of 2017. Quarter-on-quarter production rose 21% to 380,000oz at the end of the second quarter, compared to 314,000oz in the first quarter, and total cash costs improved quarter-on-quarter to $794/oz, down $48/oz, or 6% from the first quarter.

In Ghana, Iduapriem produced 126,000oz at a total cash cost of $781/oz for the six months ended 30 June 2018, compared to 107,000oz at a total cash cost of $847/oz in the same period in 2017. Production increased by 18% as a result of a 7% increase in recovered grade from mining of marginally higher grade areas and an 11% increase in tonnage treated due to improved plant reliability and utilisation compared to the previous period. Total cash costs per ounce decreased by 8% mainly due to the higher gold production, partly offset by higher mining costs from higher volumes mined and increased fuel prices. Obuasi remained in care and maintenance during the period.

In Mali, Morila's production increased by 22% to 15,000oz for the six months ended 30 June 2018 as a result of a 37% increase in recovered grade as the operation recommenced mining activities in N’tiola pit with access to higher grade ore, compared to tailings treatment in the previous period. Morila produced 12,000oz in the same period last year. At Sadiola, production was 30,000oz at a total cash cost of $980/oz for the six months ended 30 June 2018, compared to 31,000oz at a total cash cost of $862/oz in the same period last year. Production decreased in line with reduced recovered grade as the mine transitions to a stockpile treatment plan, partly offset by a 1% increase in tonnage throughput. Total cash costs per ounce increased because of stockpile treatment transition costs, full grade ore stockpile utilisation and lower production compared to the previous period.

In Guinea, at Siguiri, lower planned grades resulted in lower production and higher costs.  In Tanzania, at Geita, the increase in treated volumes was offset by a 6% drop in recovered grades and additional cost pressures from higher fees and royalties when compared to the first half of last year. However, Geita’s total cash costs remained flat quarter-on-quarter.

In the Americas region, production declined mainly due to lower tonnes treated in Brazil, where operations were impacted by a 10-day trucker strike in the region.

In Brazil, at AngloGold Ashanti Mineração, production was 11% lower due to lower grades and less tonnes treated. Cuiabá was impacted by lower tonnages and challenges accessing high-grade areas. Córrego do Sítio was mainly affected by lower grades.

At Serra Grande, production was 55,000oz for the six months ended 30 June 2018, compared to 57,000oz for the same period last year, due to lower tonnages mined and treated, partially offset by higher grade. Total cash cost was at $802/oz for the six months ended 30 June 2018, a decrease of 8%, compared to a total cash cost of $876/oz in the same period last year. Such decrease is mainly due to contributions from the higher grades and the favourable impact of exchange rates, partly offsetting lower volumes, stockpile movements and higher inflation.

In Argentina, Cerro Vanguardia’s production and costs remained relatively flat. The operation experienced unfavourable stockpile movements, due to lower tonnes mined and higher tonnes treated, which was partially ameliorated by lower heap leach costs.  Higher inflation also impacted costs negatively, following the second round of wage negotiations during the period. These negative effects were attenuated by the continued weakening of the Argentine peso and favourable efficiencies derived from lower spending on fuel, lubricants, energy, mine contractors, maintenance services, explosives and spare parts. Higher by-product income due to higher volumes sold was partially offset by the lower average silver price.

The Australia region produced 306,000oz at a total cash cost of $790/oz, compared to 255,000oz at a total cash cost of $775/oz in the same period last year. AISC for the first half of 2018 was $1,052/oz compared to $1,083/oz in the first half of last year. The 20% increase in gold production was largely due to a significant lift in the contribution from Sunrise Dam.

At Sunrise Dam the successful implementation of a strategy to lift mined grade and underground ore production resulted in a 43% increase in gold production to 153,000oz for the first half of 2018 compared to 107,000oz in the same period last year. The total cash costs decreased by 9% to $888/oz for the six months ended 30 June 2018 from $977/oz in the first half of 2017, largely due to the higher gold production. The Recovery Enhancement Project (REP) at Sunrise Dam, involving the addition of a flotation and ultra-fine circuit, was successfully commissioned on schedule in June. The REP is expected to deliver an average increase in gold recovery of 8%.

Tropicana’s production (70%) was 153,000oz for the six months ended 30 June 2018, an increase of 3% compared to the output in the amount of 148,000oz in the same period last year. The total cash costs increased by 14% to $655/oz for the six months ended 30 June 2018, compared to $575/oz in the first half of 2017. The increase in the cash cost was due to a lesser proportion of waste mining being allocated to capital in the first half of 2018 compared to the corresponding period last year. During the first half of 2018, concrete works were completed for installation of a second, 6MW ball mill in the Tropicana processing plant. This project is on schedule for completion at the end of 2018.

The South Africa region produced 257,000oz at a total cash cost of $1,152/oz for the six months ended 30 June 2018, compared to 435,000oz at a total cash cost of $1,092/oz in the same period in 2017. Total cash costs increased 6% year-on-year given inflationary pressure, particularly in wages, power and consumables, and the negative impact of the exchange rate as the Rand remained stronger against the US Dollar during the half year.

Production from retained operations (excluding Moab Khotsong and Kopanang which were sold, and TauTona undergoing orderly closure), was up 1% year-on-year to 206,000oz at a total cash cost of $1,115/oz for the six months ended 30 June 2018, compared to 204,000oz at a total cash cost of $1,014/oz in the same period in 2017. AISC from the retained operations was $1,269/oz for the first half of 2018, up from



$1,166/oz for the first half of 2017, with the increase attributable mainly to the 10% rise in cash costs year-on-year. The restructuring of the asset portfolio in South Africa, announced in May 2018, is underway to ensure that both on- and off-mine cost structures are appropriate for the considerably smaller production base. Discussions with affected employees and their representatives in organised labour are in progress and are anticipated to be completed in the second half of the year.

Mponeng delivered a 12% production improvement year-on-year at 119,000oz at a total cash cost of $1,147/oz for the six months ended 30 June 2018, compared to 106,000oz at a total cash cost of $1,046/oz in the same period in 2017. The improvement was mainly a result of a higher reef value and the operation improving mining practices. Total cash costs were 10% higher year-on-year, mainly due to inflationary increases and the negative impact of the Rand/US Dollar exchange rate.

Surface Operations produced 87,000oz at a total cash cost of $1,061/oz for the six months ended 30 June 2018, compared to 92,000oz at a total cash cost $970/oz in the same period in 2017. Production at the Vaal River Surface Sources was impacted by the sale of Mispah and West Gold plants. West Wits Surface Sources’ production was down for the first six months of the year as a result of the low-grade areas reclaimed at the Savuka marginal ore dumps and the tailings storage facilities.

Mine Waste Solutions’ production was assisted by significant recovery improvements (four percentage points higher), as the operations reverted to normal production levels compared to the first half of 2017, which was impacted by significant storms.

The Vaal River operations, which included Moab Khotsong and Kopanang, produced 51,000oz at a total cash cost of $1,307/oz for the six months ended 30 June 2018, compared to 174,000oz at a total cash cost of $1,003/oz in the same period in 2017. The decrease in production results from the fact that only two months of contribution from the mines, which were sold on 28 February 2018, have been reflected.

SAFETY UPDATE
It is with great sadness that we report three fatalities in the first half of 2018. The South Africa region suffered two fatal accidents. At Moab Khotsong a tramming accident caused one fatality and at Mponeng a mechanical loader operator was fatally injured in a seismic fall of ground. In Brazil there was one fatality following an electricity-related incident. AngloGold Ashanti remains committed to establishing and adhering to the best safety practices in the industry. The group’s All-Injury Frequency Rate, the broadest measure of workplace safety, was 5.6 injuries per million hours worked for the six months ended 30 June 2018, down 31% from the first half of last year and its lowest level in the Company’s history.

UPDATE ON CAPITAL PROJECTS

Kibali
At Kibali, the underground ore production has now stabilised at planned capacity and the underground materials handling system and ore hoisting via the shaft is on track to reach name plate capacity. The total underground ore tonnes mined for the first half of the year are 1,686t (compared to 1,595kt in the same period last year), of which 1,194kt were hoisted (compared to 118kt in the same period last year). In addition, 5km of development was completed from the declines. The third hydropower station at Azambi is still on track for completion in the second half of 2018. Construction of the next phase of tailings storage facility was initiated at the end of 2017, providing additional capacity for carbon in leach (CIL) tails and is scheduled for completion in the second half of 2018.

Mponeng Phase 1 and 2
Phase 1 was negatively impacted by a fatal accident which occurred on 126 level in April 2018. This fatal accident caused a delay in the ore reserve development and also had an impact on the construction activities to a lesser extent. Progress on the construction activities was as follows:
Water Management Infrastructure - piping installation completed;
Ore Handling Infrastructure - construction completed with commissioning planned for the third quarter of 2018;
The reef pass between 123 and 126 level is delayed due to the breakdown on the raiseborer reamer head. This is an additional scope to overcome congestion on 123 level tramming;
The ventilation hole from 116 level to decline 3 was stopped due to repeated non-compliance in accuracy by the contractor. A procurement process has been initiated for the replacement of the contractor; and
Ore Reserve Development at 126 level - encountered slow advance rates in areas of high geological complexity, which require additional secondary support.

The Mponeng feasibility study
A technical review was undertaken in the period ended June 2018, resulting in various technical recommendations which include optimising capital expenditure, and conducting further studies in the ventilation and tailing storage strategies.

The Technology Innovation project has been scaled down in line with the accelerated closure of the TauTona mine. Work continues to establish the site for the High Strength Backfill (HSB) plant at Mponeng mine. However, delays were encountered in the development of the excavation and it is estimated that the plant construction will now commence in third quarter of 2018.

Siguiri Combination Plant
Siguiri is undergoing construction of a new Combination Plant, which is expected to be completed by year end and will allow for the treatment of harder rock.  Most of the civil work is nearing completion, which is anticipated by the third quarter of the year. The mill was lifted into position and the installation of the secondary and tertiary crushers was completed during the first half of the year. The conversion of the carbon-in-leach tanks has been completed. Construction of the new power plant, to meet additional power requirements, will be ready for commercial operations during the fourth quarter, as planned.

Obuasi project
In June 2018 the parliament of Ghana ratified the development and fiscal agreement for the redevelopment of Obuasi. After considering the environmental impact statements for the project, the EPA issued the permits for the project. Work has started in earnest towards the redevelopment of the Obuasi high-grade orebody, including commencement of the recruitment of the project and operating teams. Detailed planning for execution and preparation for early works contracts continue, with focus on redeveloping the mine into a modern and mechanised



operation. AUMS, through its 70/30 JV with Rocksure International (a Ghanaian mining contractor), is the preferred contractor for delivery of underground mining services. Negotiations of the final contract terms and conditions are well advanced with an expectation that project works will commence later in 2018.  The joint venture will trade under the name Underground Mining Alliance Limited. The project will be developed in two phases; the first phase will enable a production rate of 2,000tpd and first gold is expected in late 2019, while the second phase will enable production to be increased to 4,000tpd, approximately 12 months later, toward the end of 2020.

CORPORATE UPDATE

CEO Transition
On 23 July 2018, the Company announced the appointment of Kelvin Dushnisky as chief executive officer (CEO) and an executive director of the Board of Directors of AngloGold Ashanti, effective 1 September 2018. Mr. Dushnisky, who will relocate to Johannesburg, where AngloGold Ashanti is based, replaces outgoing CEO Srinivasan Venkatakrishnan (Venkat), who departs at the end of August 2018 for a role at London-based Vedanta Resources. Venkat will cease to be a member of the Company's Board of Directors with effect from 31 August 2018.

Obuasi Arbitration Proceedings Resolved
The Obuasi mine, operated by AngloGold Ashanti (Ghana) Limited, had been the subject of a dispute with the Republic of Ghana since February 2016, when military protection was withdrawn from the mine and the site was being overrun by illegal miners for close to nine months.

The case was registered with the International Centre for Settlement of Investment Disputes on 2 May 2016, with the Company filing an urgent request for provisional measures on 3 June 2016. This request was eventually voluntarily suspended following the gradual restoration of law and order at the mine under the directive of the Minerals Commission from October 2016 onwards.

AngloGold Ashanti (Ghana) Limited proceeded to file a memorial on the merits in April 2017. Shortly thereafter, the parties by mutual agreement suspended the proceedings in order to explore an amicable resolution to the dispute. The dispute has now been resolved to the parties’ mutual satisfaction and the Company has submitted a request to the Tribunal on 19 July 2018 that the proceedings be discontinued. Further, the Ghanaian Parliament has ratified a number of regulatory and fiscal agreements with the Company in relation to the redevelopment of the mine into a modern and mechanised operation, marking an important step for the mine’s future.

DRC Mining Code and Regulations amendment
In the DRC, the Mining Code and Regulations have been amended with an updated Mining Code which came into effect on 9 March 2018 (2018 Mining Code) and the related amended Mining Regulations which came into effect on 8 June 2018, although the regulations were only actually published in July 2018 so have only recently started being enforced. Kibali Goldmines SA is considering all its options to protect its vested rights under the 2002 Mining Code, as well as the specific state guarantees it previously received, including preparing for international arbitration. In addition, it continues to engage with the government to find alternative solutions which would be mutually acceptable to both parties, including through the application of Article 220 of the 2018 Mining Code, which affords benefits to mining companies in landlocked infrastructurally challenged provinces, such as where Kibali is located.

EXPLORATION
See the Exploration Update document on the Company's website (www.anglogoldashanti.com) for an update on both Brownfields and Greenfields exploration programmes.






eylogoli.jpg
EY
102 Rivonia Road
Sandton
Private Bag X14
Sandton
2146
 
Ernst & Young Incorporated
Co. Reg. No. 2005/002308/21
Tel: +27 (0) 11 772 3000
Fax: +27 (0) 11 772 4000
Docex 123 Randburg
ey.com




Independent auditor’s review report on the Condensed Consolidated Financial Statements for the six months ended 30 June 2018 to the Shareholders of AngloGold Ashanti Limited

We have reviewed the condensed consolidated financial statements of AngloGold Ashanti Limited (the Company) contained in the accompanying interim report on pages 9 to 29, which comprise the accompanying condensed consolidated statement of financial position as at 30 June 2018, the condensed consolidated income statement, statement of comprehensive income, statement of changes in equity and statement of cash flows for the six months then ended, and selected explanatory notes.

Directors’ Responsibility for the Condensed Consolidated Financial Statements

The directors are responsible for the preparation and presentation of these condensed consolidated financial statements in accordance with the International Financial Reporting Standard, IAS 34 Interim Financial Reporting as issued by the International Accounting Standards Board (IASB), the SAICA Financial Reporting Guides, as issued by the Accounting Practices Committee and Financial Reporting Pronouncements as issued by the Financial Reporting Standards Council, and the requirements of the Companies Act of South Africa, and for such internal control as the directors determine is necessary to enable the preparation of condensed consolidated financial statements that are free from material misstatement, whether due to fraud or error.

Auditor’s Responsibility

Our responsibility is to express a conclusion on these interim financial statements based on our review. We conducted our review in accordance with International Standard on Review Engagements (ISRE) 2410, Review of Interim Financial Information Performed by the Independent Auditor of the Entity. This standard requires us to conclude whether anything has come to our attention that causes us to believe that the interim financial statements are not prepared in all material respects in accordance with the applicable financial reporting framework. This standard also requires us to comply with relevant ethical requirements.

A review of interim financial statements in accordance with ISRE 2410 is a limited assurance engagement. We perform procedures, primarily consisting of making enquiries of management and others within the entity, as appropriate, and applying analytical procedures and evaluating the evidence obtained.

The procedures performed in a review are substantially less than and differ in nature from those performed in an audit conducted in accordance with International Standards on Auditing. Accordingly, we do not express an audit opinion on these financial statements.

Conclusion

Based on our review, nothing has come to our attention that causes us to believe that the accompanying condensed consolidated financial statements of the company for the six months ended 30 June 2018 are not prepared, in all material respects, in accordance with International Financial Reporting Standard, IAS 34 Interim Financial Reporting as issued by the IASB, the SAICA Financial Reporting Guides as issued by the Accounting Practices Committee and Financial Reporting Pronouncements as issued by the Financial Reporting Standards Council and the requirements of the Companies Act of South Africa.



Ernst & Young Inc.
Director - Ernest Adriaan Lodewyk Botha
Registered Auditor
Chartered Accountant (SA)
102 Rivonia Road, Sandton
Johannesburg, South Africa
16 August 2018


A member firm of Ernst & Young Global Limited.
A full list of Directors is available on the website.
Chief Executive: Ajen Sita




GROUP – INCOME STATEMENT
 

 
 
 
 
 
 
 
 
 
Six months
Six months
Year
 
 
 
ended
ended
ended
 
 
 
Jun
Jun
Dec
 
 
 
2018
2017
2017
US Dollar million
Notes
 
Reviewed
Restated
Restated
 
 
 
 
 
 
 
 
 
 
 
 
Revenue from product sales
2
 
2,002
2,113
4,510
Cost of sales
3
 
(1,602)
(1,790)
(3,736)
Gain (loss) on non-hedge derivatives and other commodity contracts
 
 
10
2
10
Gross profit
 
 
410
325
784
Corporate administration, marketing and other expenses
 
 
(37)
(35)
(64)
Exploration and evaluation costs
 
 
(46)
(62)
(114)
Other operating expenses
4
 
(57)
(40)
(88)
Special items
5
 
(151)
(253)
(438)
Operating profit (loss)
 
 
119
(65)
80
Interest income
 
 
9
8
15
Other gains and (losses)
 
 
3
(4)
(11)
Finance costs and unwinding of obligations
6
 
(85)
(83)
(169)
Share of associates and joint ventures' profit (loss)
7
 
40
(9)
22
Profit (loss) before taxation
 
 
86
(153)
(63)
Taxation
8
 
(43)
(12)
(108)
Profit (loss) after taxation
 
 
43
(165)
(171)
 
 
 
 
 
 
Allocated as follows:
 
 
 
 
 
Equity shareholders
 
 
33
(176)
(191)
Non-controlling interests
 
 
10
11
20
 
 
 
43
(165)
(171)
 
 
 
 
 
 
Basic profit (loss) per ordinary share (cents) (1)
 
 
8
(43)
(46)
Diluted profit (loss) per ordinary share (cents) (2)
 
 
8
(43)
(46)
(1) Calculated on the basic weighted average number of ordinary shares.
 
 
 
 
(2) Calculated on the diluted weighted average number of ordinary shares.
 
 
 
 
 
 
 
 
 
 
 
 
The financial statements for the six months ended 30 June 2018 have been prepared by the corporate accounting staff of AngloGold Ashanti Limited headed by Mr Ian Kramer (CA (SA)), the Group's VP: Finance. This process was supervised by Ms Kandimathie Christine Ramon (CA (SA)), the Group's Chief Financial Officer and Mr Srinivasan Venkatakrishnan (BCom; ACA (ICAI)), the Group's Chief Executive Officer. The financial statements for the six months ended 30 June 2018 were reviewed, but not audited, by the Group's statutory auditors, Ernst & Young Inc.
 
Any forward looking financial information disclosed in this results announcement has not been reviewed or audited or otherwise reported on by Ernst & Young Inc.
 
Certain information presented in this results announcement constitutes pro forma financial information. This information is the responsibility of the Company’s board of directors and is presented for illustrative purposes only. Because of its nature the pro forma financial information may not fairly present the Company’s financial information, changes in equity and results of operations or cash flows. This information has not been reviewed or audited or otherwise reported on by Ernst & Young Inc.





GROUP – STATEMENT OF COMPREHENSIVE INCOME
 
 
 
 
 
 
 
 
 
 
Six months

Six months

Year
 
 
 
ended

ended

ended
 
 
 
Jun

Jun

Dec
 
 
 
2018

2017

2017
US Dollar million
 
 
Reviewed

Reviewed

Audited
 
 
 
 
 
 
Profit (loss) for the period
 
 
43

(165)

(171)
 
 
 
 
 
 
Items that will be reclassified subsequently to profit or loss:
 
 
 
 
 
Exchange differences on translation of foreign operations
 
 
(102)

83

123
Net gain (loss) on available-for-sale financial assets
 
 

3

20
Release on impairment of available-for-sale financial assets
 
 

1

3
Release on disposal of available-for-sale financial assets
 
 


(6)
Deferred taxation thereon
 
 

2

8
 
 
 

6

25
Items that will not be reclassified subsequently to profit or loss:
 
 
 
 
 
Net gain (loss) on equity investments
 
 
25


Actuarial gain (loss) recognised
 
 


8
Deferred taxation thereon
 
 


(2)
 
 
 
25


6
 
 
 
 
 
 
Other comprehensive income (loss) for the period, net of tax
 
 
(77)

89

154
 
 
 
 
 
 
Total comprehensive income (loss) for the period, net of tax
 
 
(34)

(76)

(17)
 
 
 
 
 
 
Allocated as follows:
 
 
 
 
 
Equity shareholders
 
 
(44)

(87)

(37)
Non-controlling interests
 
 
10

11

20
 
 
 
(34)

(76)

(17)
 
 
 
 
 
 




GROUP – STATEMENT OF FINANCIAL POSITION
 
 
 
 
 
 
 
 
As at

As at

As at
 
 
Jun

Jun

Dec
 
 
2018

2017

2017
US Dollar million
Note
Reviewed

Reviewed

Audited
 
 
 
 
 
 
 
 
 
 
ASSETS
 
 
 
 
Non-current assets
 
 
 
 
Tangible assets
 
3,478

4,105

3,742
Intangible assets
 
131

150

138
Investments in associates and joint ventures
 
1,504

1,464

1,507
Other investments
 
150

139

131
Inventories
 
91

87

100
Trade, other receivables and other assets
 
73

35

67
Deferred taxation
 
5

5

4
Cash restricted for use
 
34

37

37
 
 
5,466

6,022

5,726
 
 
 
 
 
Current assets
 
 
 
 
Other investments
 
6

7

7
Inventories
 
646

681

683
Trade, other receivables and other assets
 
252

287

222
Cash restricted for use
 
19

19

28
Cash and cash equivalents
 
215

164

205
 
 
1,138

1,158

1,145
Non current assets held for sale
 


348
 
 
1,138

1,158

1,493
 
 
 
 
 
Total assets
 
6,604

7,180

7,219
 
 
 
 
 
EQUITY AND LIABILITIES
 
 
 
 
Share capital and premium
10
7,157

7,124

7,134
Accumulated losses and other reserves
 
(4,552)

(4,522)

(4,471)
Shareholders' equity
 
2,605

2,602

2,663
Non-controlling interests
 
36

31

41
Total equity
 
2,641

2,633

2,704
 
 
 
 
 
Non-current liabilities
 
 
 
 
Borrowings
 
2,004

2,312

2,230
Environmental rehabilitation and other provisions
 
868

944

942
Provision for pension and post-retirement benefits
 
111

125

122
Trade, other payables and deferred income
 
2

7

3
Deferred taxation
 
359

423

363
 
 
3,344

3,811

3,660
 
 
 
 
 
Current liabilities
 
 
 
 
Borrowings
 
47

54

38
Trade, other payables, deferred income and provisions
 
536

628

638
Taxation
 
36

54

53
 
 
619

736

729
Non current liabilities held for sale
 


126
 
 
619

736

855
 
 
 
 
 
Total liabilities
 
3,963

4,547

4,515
 
 
 
 
 
Total equity and liabilities
 
6,604

7,180

7,219
 
 
 
 
 
 
 
 
 
 



GROUP – STATEMENT OF CASH FLOWS
 
 
 
 
 
 
 
 
 
 
 
 
Six months

Six months

Year

 
 
 
ended

ended

ended

 
 
 
Jun

Jun

Dec

 
 
 
2018

2017

2017

US Dollar million
 
 
Reviewed

Reviewed

Audited

Cash flows from operating activities
 
 
 
 
 
Receipts from customers
 
 
1,981

2,101

4,534

Payments to suppliers and employees
 
 
(1,613
)
(1,684)

(3,383)

Cash generated from operations
 
 
368

417

1,151

Dividends received from joint ventures
 
 
49


6

Taxation refund
 
 

11

14

Taxation paid
 
 
(96)

(107)

(174)

Net cash inflow (outflow) from operating activities
 
 
321

321

997

 
 
 
 
 
 
Cash flows from investing activities
 
 
 
 
 
Capital expenditure
 
 
(293)

(390)

(829)

Expenditure on intangible assets
 
 

(1)

(1)

Proceeds from disposal of tangible assets
 
 
310

2

7

Other investments acquired
 
 
(54)

(54)

(91)

Proceeds from disposal of other investments
 
 
76

46

78

Investments in associates and joint ventures
 
 
(5)

(20)

(27)

Loans advanced to associates and joint ventures
 
 
(3)

(3)

(6)

Cash payment to settle the sale of environmental trust fund
 
 
(32)



Decrease (increase) in cash restricted for use
 
 
9


(8)

Interest received
 
 
7

8

15

Net cash inflow (outflow) from investing activities
 
 
15

(412)

(862)

 
 
 
 
 
 
Cash flows from financing activities
 
 
 
 
 
Proceeds from borrowings
 
 
283

331

815

Repayment of borrowings
 
 
(500)

(167)

(767)

Finance costs paid
 
 
(66)

(67)

(138)

Dividends paid
 
 
(39)

(58)

(58)

Net cash inflow (outflow) from financing activities
 
 
(322)

39

(148)

 
 
 
 
 
 
Net increase (decrease) in cash and cash equivalents
 
 
14

(52)

(13)

Translation
 
 
(4)

1

3

Cash and cash equivalents at beginning of period
 
 
205

215

215

Cash and cash equivalents at end of period
 
 
215

164

205

 
 
 
 
 
 
 
 
 
 
 
 



GROUP – STATEMENT OF CHANGES IN EQUITY
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Equity holders of the parent
 
 
 
 
 
Share capital and premium

 
Other
capital reserves

 
Accumulated losses
 
Fair value through OCI

 
Available -for-sale reserve

 
Actuarial (losses) gains

 
Foreign currency translation reserve
 
 
Non-controlling interests
Total equity

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
US Dollar million
 
 
 
 
 
 
 
Total

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Balance at 31 December 2016
7,108

 
116

 
(3,119)
 
 
 
17

 
(21)

 
(1,386)
 
2,715

39
2,754

Profit (loss) for the period
 
 
 
 
(176)
 
 
 
 
 
 
 
 
 
(176)

11
(165)

Other comprehensive income (loss)
 
 
 
 
 
 
 
 
6

 
 
 
83
 
89

 
89

Total comprehensive income (loss)

 

 
(176)
 
 
 
6

 

 
83
 
(87)

11
(76)

Shares issued
16

 
 
 
 
 
 
 
 
 
 
 
 
 
16

 
16

Share-based payment for share awards net of exercised
 
 
(3)

 
 
 
 
 
 
 
 
 
 
 
(3)

 
(3)

Dividends paid
 
 
 
 
(39)
 
 
 
 
 
 
 
 
 
(39)

 
(39)

Dividends of subsidiaries
 
 
 
 
 
 
 
 
 
 
 
 
 
 

(19)
(19)

Translation
 
 
4

 
(4)
 
 
 
1

 
(1)

 
 
 

 

Balance at 30 June 2017
7,124

 
117

 
(3,338)
 
 
 
24

 
(22)

 
(1,303)
 
2,602

31
2,633

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Balance at 31 December 2017
7,134

 
124

 
(3,359)
 

 
43

 
(16)

 
(1,263)
 
2,663

41
2,704

Impact of adopting IFRS 9


 


 
10
 
33

 
(43)

 


 

 



Restated opening balance under IFRS 9
7,134

 
124

 
(3,349)
 
33

 

 
(16)

 
(1,263)
 
2,663

41
2,704

Profit (loss) for the period


 


 
33
 


 


 


 

 
33

10
43

Other comprehensive income (loss)


 


 

 
25

 


 


 
(102)
 
(77)


(77)

Total comprehensive income (loss)

 

 
33
 
25

 

 

 
(102)
 
(44)

10
(34)

Shares issued
23

 


 

 


 


 


 

 
23


23

Share-based payment for share awards net of exercised


 
(13)

 

 


 


 


 

 
(13)


(13)

Dividends paid


 


 
(24)
 


 


 


 

 
(24)


(24)

Dividends of subsidiaries


 


 

 


 


 


 

 

(15)
(15)

Transfer of gain on disposal of equity investments


 


 
13
 
(13)

 


 


 

 



Translation


 
(7)

 
6
 
1

 


 


 

 



Balance at 30 June 2018
7,157

 
104

 
(3,321)
 
46

 

 
(16)

 
(1,365)
 
2,605

36
2,641

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 





Segmental reporting

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
AngloGold Ashanti’s operating segments are being reported based on the financial information provided to the Chief Executive Officer and the Executive Committee, collectively identified as the Chief Operating Decision Maker (CODM). Individual members of the Executive Committee are responsible for geographic regions of the business.
 
 
 
 
 
 
 
 
 

Gold income        
 
 
 
 
 
 
 
 
 
 
Six months
Six months
Year
 
 
 
ended
ended
ended
 
 
 
Jun
Jun
Dec
 
 
 
2018
2017
2017
US Dollar million
 
 
Reviewed
Reviewed
Audited
 
 
 
 
 
 
 
South Africa
 
 
 
332
525
1,101
Continental Africa
 
 
 
972
884
1,895
Australasia
 
 
 
390
315
709
Americas
 
 
 
514
524
1,104
 
 
 
 
 
 
2,208
2,248
4,809
Equity-accounted investments included above
 
 
(286)
(216)
(453)
 
 
 
 
1,922
2,032
4,356
 
 
 
 
 
 
 
 
 

By-product revenue        
 
 
 
 
 
 
 
 
 
 
Six months
Six months

Year
 
 
 
ended
ended

ended
 
 
 
Jun
Jun

Dec
 
 
 
2018
2017

2017
US Dollar million
 
 
Reviewed
Reviewed

Audited
 
 
 
 
 
 
 
South Africa
 
 
 
6
8

15
Continental Africa
 
 
 
2
2

3
Australasia
 
 
 
1
1

2
Americas
 
 
 
72
70

135
 
 
 
 
 
 
81
81

155
Equity-accounted investments included above
 
 
(1)

(1)
 
 
 
 
80
81

154
 
 
 
 
 
 
 
 
 


Gross profit (loss)        
 
 
 
 
 
 
 
 
 
 
Six months
Six months
Year
 
 
 
ended
ended
ended
 
 
 
Jun
Jun
Dec
 
 
 
2018
2017
2017
US Dollar million
 
 
Reviewed
Reviewed
Audited
 
 
 
 
 
 
 
South Africa
 
 
 
(10)
(28)
(3)
Continental Africa
 
 
 
185
143
386
Australasia
 
 
 
100
66
159
Americas
 
 
 
157
130
253
Corporate and other
 
 
 
15
2
2
 
 
 
 
 
 
447
313
797
Equity-accounted investments included above
 
 
(37)
12
(13)
 
 
 
 
410
325
784
 
 
 
 
 
 
 
 
 




Segmental reporting (continued)    

Cost of sales        
 
 
 
 
 
 
 
 
 
 
Six months
Six months
Year
 
 
 
ended
ended
ended
 
 
 
Jun
Jun
Dec
 
 
 
2018
2017
2017
US Dollar million
 
 
Reviewed
Restated
Restated
 
 
 
 
 
 
 
South Africa
 
 
 
352
563
1,129
Continental Africa
 
 
 
788
742
1,513
Australasia
 
 
 
290
250
551
Americas
 
 
 
430
465
987
Corporate and other
 
 
 
(8)
(2)
(3)
 
 
 
 
 
 
1,852
2,018
4,177
Equity-accounted investments included above
 
 
(250)
(228)
(441)
 
 
 
 
1,602
1,790
3,736
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Amortisation        
 
 
 
 
 
 
 
 
 
 
Six months

Six months

Year

 
 
 
ended

ended

ended

 
 
 
Jun

Jun

Dec

 
 
 
2018

2017

2017

US Dollar million
 
 
Reviewed

Reviewed

Audited

 
 
 
 
 
 
 
South Africa
 
 
 
42

80

133

Continental Africa
 
 
 
183

218

421

Australasia
 
 
 
63

53

130

Americas
 
 
 
89

110

273

Corporate and other
 
 
 
2

2

2

 
 
 
 
 
 
379

463

959

Equity-accounted investments included above
 
 
(82)

(71)

(136)

 
 
 
 
297

392

823

 
 
 
 
 
 
 
 
 


Capital expenditure
 
 
 
 
 
 
 
 
 
 
Six months

Six months

Year

 
 
 
ended

ended

ended

 
 
 
Jun

Jun

Dec

 
 
 
2018

2017

2017

US Dollar million
 
 
Reviewed

Reviewed

Audited

 
 
 
 
 
 
 
South Africa
 
 
 
41

81

150

Continental Africa
 
 
 
139

191

409

Australasia
 
 
 
79

66

153

Americas
 
 
 
75

114

234

Corporate and other
 
 
 
1

2

7

 
 
 
 
335

454

953

Equity-accounted investments included above
 
 
 
(42)

(63)

(123)

 
 
 
 
 
 
293

391

830